KGHM POLSKA MIEDŹ S.A.
font size: A A A PDF report
Homepage / Financial statements / Annual consolidated financial statements / Accounting policies and other explanatory information / 6. Property, plant and equipment

KGHM POLSKA MIEDŹ S.A. GROUP

Annual consolidated financial statements

 At
 31 December 201131 December 2010
restated

Land

39 165 6 922

Buildings

3 586 921 3 885 290

Technical equipment and machinery

3 208 377 3 161 8339

Motor vehicles

242 955 198 773

Other fixed assets

84 337 69 152

Fixed assets under construction

1 884 022 1 318 578

Total

9 045 777 8 670 554


Major investment projects recognised under fixed assets under construction

 At
 31 December 201131 December 2010 restated

Construction of the SW-4 shaft

471 432 392 400

Głogów Głęboki – Przemysłowy

295 997 208 329

Construction of gas-steam blocks in Głogów and Polkowice Powerplants

179 593 9 305

Ventilation and air conditioning equipment in the mines

136 399 215 643

Investments related to mining region infrastructural development in mines

111 431 48 216

Program of Pyrometallurgy Modernisation

78 226 12 813

Sulphuric Acid Plant in Głogów I Smelter, Głogów II Smelter and Legnica Smelter

69 294 34 950

Exchange of floatation machinery in the Ore Enrichment Plants

69 252 60 872

Purchase of mine machinery and technical equipment

50 781 19 613

Conformatory work

42 366 10 019

Power and communications infrastructure

36 557 35 353

Investments in power and communications infrastructure, related buildings and other investments in the Ore Enrichment Plants

32 031 15 151

Construction of the LETIA Business Center (LBC) at the Legnica Technology Park

31 138 9 505

Exploratory drillings (to analyse mineral ore) in the Weisswasser concession

31 099 -

Design, construction and obtaining of permits to utilise a sulphuric acid warehouse-loading base, with required technical infrastructure

23 265 1 722

Shafts and primary equipments in mines

23 009 24 540

Conveyor belt and pipeline transport investments

20 064 6 273

Intensification of lead production – development of the 4th Doerschel furnace at the Głogów smelter

- 37 037

Modernisation of steam and water boilers

- 32 234

Construction of a hotel “Medical SPA” in Świnoujście

- 26 473

Total

1 701 934 1 200 448
Report on shortcuts